Original design as submitted with dimensions > HERE

.     Monument Sign Detail: All aluminum with base at grade (or slightly below if permitted for aesthetics only.)
.     This footing configuration shows offset mounting pole with caisson out of the PUE (Public Utilities Right-of-way). This proposed installation allows the sign to cantilever over the PUE without below grade impact in the PUE ROW.
.     Property owner is willing to sign agreement with City of Peoria to remove sign upon request for any City approved PUE excavation access required. Sign can then be re-installed using same internal pole and caisson.

 
7-18-6 Note below from Cawley Architects with site plan (partial) above.
"This is further to the city comments for the location of the monument signage. I have been coordinating with Mike Scully regarding the relocation of the monument signage. Per my conversation and email to Mike yesterday, we were going to keep the original 10’-0” length of the signage and redesign the parking screen walls. But, the site walls have been already constructed. To keep the length of the sign at 10’-0”, we will have to demolish the parking screen walls that have already been constructed and have to rebuild them. Our other option is to keep the site walls as is and revise the length of the monument signage to 5’-4”. Attached is the location and size of the monument signage with the parking screen walls as per site condition. . . . " JS
7-24-6 Revised site plan below by Mike Scully as a proposed 'cantilever' solution to allow the proposed sign to maintain the preferred size and possibly comply with the PUE ROW requirement.


7-24-6 Showing sign caisson and pole back of PUE / ROW with sign 'cantilevered' up to P/L.

Uncle Sam's sign at P/L   Photo 7-20-6

Paradise Point    Photo 7-20-6

View North showing signs at P/L   Photo 7-20-6

Additional details available separate from this presentation page.

A full site plan is available as a PDF > HERE
When the page opens, simply click on "Paradise_Point_Site.pdf"
Allow about 60 seconds for it to fully download [standard connection]
and render.


This page created and last updated 07/23/2006

Naturalite Neon < Home

Scully Design